2025-05-05 | dave |
GC Sequence run LTAR20250425S4BGC: Note on sample trays from techs: “vial swap for some FROG vials” All samples were run in sequential order, but some vials swapped and submitted to lab as follows: ….39, 40, 57, 42, 43, 44, 61, 46, 47, 48, 65, 50, 51, 52, 69, 54, 55, 56, 41, 58, 59, 60, 45, 62, 63, 64, 49, 66, 67, 68, 53, 70, 71, 72….. and ….244, 245, 248, 247, 246, 249, 250…. |
|
|
2025-05-02 | dave |
Sequence BLESH202504S1S2S3BGC had some hiccups - mainly in skipped samples. Samples were likely skipped due to having the Excel Results file open to look at data, as the GC was running. Samples 218, 219, and 354 were skipped for the methane portion of the run. Sample 199 was skipped for the CO2/N2O portion. At the same time, it appeared that one line of data was appended without assigning it a vial number - so everything was off one row (verified by check standards). This happened around the missing 218 vial mark. The Results file sequence lines were corrected and saved as a file with the sequences name. Skipped samples listed above were re-analyzed in groups of 4 with corresponding B and C versions of the Sequence/File name. |
|
|
2025-05-02 | dave |
Sequence LTAR202504240430S6S7BGC has two issues.
|
|
|
2025-05-02 | Alyssa |
Prepared .1M HCL (1L) for column conditioning: 8.3 ml of 37% HCL in Nanopure, dilute to 1L. Reconditioned Cadmium Column Lachat run GLBRC MLE MC Soil (Lake City) 20241113. |
|
|
2025-05-01 | Alyssa |
Prepared Standards, Acid washed dishes. Lachat run GLBRC MLE MN Soil (Escanaba) 20241112. |
|
|
2025-04-30 | Alyssa |
Lachat run LTER Lysimeter 20240715. |
|
|
2025-04-29 | vanderws |
BCSE and LTAR gas chamber prep - Alyssa, Brian Finish forest N-deposition fertilization - Trajana, Olivia Collect LTAR leachate - Slater, Sam Sample ASP3 and ASP4 plants ahead of herbicide - Alyssa, Brian, Trajana, Olivia, Slater, Sam |
|
|
2025-04-28 | Alyssa |
Prepared Color Reagent (2 L) 200 ml phosphoric acid 80 gm sulfanilamide, 2.0 gm N-1-naphthylethylenediamine dihydrochloride, Dilute to 2L with Nanopure H2O. Lachat run LTER Lysimeter 20240702. |
|
|
2025-04-28 | vanderws |
LTAR and BCSE gas vial and tote prep, dishes - Sam, Trajana |
|
|
2025-04-28 | vanderws |
Help Poulamee and Maxwell from the Kravchenko lab sample BCSE soil for MONet - Brian, Olivia Fertilize N-deposition microplots - Slater, Andie Evacuate LTAR lysimeters - Sam, Trajana |
|
|
2025-04-25 | vanderws |
Filter LTER soil extracts - Alyssa, Olivia |
|
|
2025-04-25 | dave |
Noticed an issue with inconsistent check standards on LTAR202504100417S4S5BGC run. Some checks made before, some after, a nitrogen tank change-out. (N2 used in making up standards.) High standards, with no N2 addition, appear to be fairly consistent across the last 3 sample runs. A separate standard/check std run was completed after the LTAR run to test for this issue. This standard run would likely be better to use with the LTAR run. Standard run was STD_TEST20250424BGC. |
|
|
2025-04-25 | vanderws |
LTER Series 4 gas sampling - Slater, Trajana, Brian, Andie, Olivia LTER Hydrosense - Alyssa |
|
|
2025-04-24 | Alyssa |
Prepared 1M KCL. |
|
|
2025-04-24 | vanderws |
Weigh LTER soil for extraction and moisture - Brian, Trajana, Olivia, Alyssa Dishes - Olivia |
|
|
2025-04-24 | vanderws |
LTAR Series 6 gas sampling (BAU1 R1 was installed just prior to sampling - was missed during prep); ASP3 microplot chambers were installed by the Blesh lab 4/23 since they are sharing those chambers, were installing their other chambers and techs had forgotten to install those. An error was made in sampling ASP3 microplots due to confusion with the Blesh lab chambers in the neighboring microplots in ASP3. ASP3 R2 and R4 no compost microplots were sampled correctly. ASP3 R1 and R3 Blesh lab microplot chambers in the next microplot to the east were accidently sampled. - Slater, Olivia, Stacey LTAR Hydrosense - Alyssa Install LTER T1, 2, 6 gas chambers - Slater, Trajana, Brian |
|
|
2025-04-23 | vanderws |
Sieve LTER soil - Alyssa, Slater, Brian, Trajana, Andie |
|
|
2025-04-23 | dave |
BCSE202503310416S2S3BGC sample run on GC had a small set of samples submitted out of order on the trays. All vials were run on the GC in numerical order. Vials out of order on trays as follows: ….56, 57, 59, 58, 60, 61, 62, 63….. |
|
|
2025-04-23 | dave |
LTAR202504100417S4S5BGC sample run on GC had vials submitted out of order on trays. All samples were run on GC in numerical order. Samples submitted out of order as follows: …4, 5, 9, 7, 8, 6, 10, 11, 12… and …135, 136, 140, 137, 138, 139, 141, 142…. |
|
|
2025-04-23 | vanderws |
LTER 2nd April soil sampling - Alyssa, Slater, Brian, Trajana, Andie Install ASP1 and ASP5 chambers - Help Mark move OTCs - Brian, Slater |
|
|
2025-04-22 | vanderws |
Filter LTER leachate - Grind SBE plants - |
|
|
2025-04-22 | vanderws |
Collect LTER leachate - Olivia, Slater LTAR and LTER gas chamber prep; pulled ASP1 and ASP5 chambers, installed BAU1 and ASP3 main, forgot to install ASP3 microplot chambers - Brian, Trajana |
|
|
2025-04-22 | Alyssa |
Prepared Standards, Replaced Cadmium Column. Lachat run LTER Lysimeters 20240617. |
|
|
2025-04-21 | Alyssa |
Reconditioned Cadmium Column. Lachat run LTER soil 20211112. |
|
|
2025-04-21 | vanderws |
LTAR and LTER gas vial, tote prep; dishes - Slater Finish subsampling archive for Jin Ho - Trajana |
|
|
2025-04-21 | vanderws |
Evacuate LTER lysimeters - Brian, Olivia Install T6R1-6S5 flags for Jin Ho to sample soil - Brian |
|
|
2025-04-18 | vanderws |
Install ASP6 flags - |
|
|
2025-04-18 | Alyssa |
Acid washed dishes. |
|
|
2025-04-18 | vanderws |
Archive air-dried LTAR R5 soil samples, subsample LTER soil archive for Jin Ho Lee (10g each from T3R1-6S5 2020, 2021, and 2022) - Grind SBE plants, pulverize BCSE deep core soil, BAF subsampling - |
|
|
2025-04-17 | vanderws |
Dishes, grind SBE plants, pulverize BCSE deep core soil, BAF subsampling - Brian, Olivia, Slater, Trajana |
|
|
2025-04-17 | Alyssa |
Prepared Ammonium Chloride Reagent (4L): 320 gms Ammonium Chloride 4.0 gms EDTA pH to 8.45 with NaOH, store Replaced Reagent tubing, finished Lachat run GLBRC Microplot soil 20241111. |
|
|
2025-04-17 | vanderws |
LTAR 5 gas sampling - Slater, Trajana, Olivia LTAR Hydrosense - Alyssa |
|
|
2025-04-16 | Alyssa |
Prepared fresh Phosphate Buffer (1L) 28 gms Sodium Hydroxide pellets 50 gms sodium phosphate dibasic heptahydrate dilute to 1 L with nanopure. Prepared EDTA Reagent (1L) 66 gms ethylenediamine tetraacetic acid disodium salt dihydrate (EDTA) Approximately 7.0 gms sodium hydroxide pellets ph to 7.03 with NaOH pellets then dilute to volume with nanopure. Lachat run GLBRC Microplot soil 20241111. |
|
|
2025-04-16 | vanderws |
Collect LTAR leachate - Andie, Trajana BCSE 3 gas sampling - Slater, Brian BCSE Hydrosense - Alyssa |
|
|
2025-04-16 | vanderws |
Measure, filter and archive LTAR leachate; one spring sampling and one fall sampling will be archived each year, 20mL sample with conical seal cap (same as LTER) - Filter LTAR soil extracts - |
|
|
2025-04-15 | Alyssa |
Prepared Standards, Lachat run GLBRC Main soil 20241104. |
|
|
2025-04-15 | vanderws |
Evacuate LTAR lysimeters, prep BCSE and LTAR gas chambers - Olivia, Brian |
|
|
2025-04-15 | vanderws |
Weigh LTAR soil for extraction and moisture - Slater, Trajana Grind SBE plants and pulverize BCSE deep core soil - Olivia, Brian Prep BCSE and LTAR gas vials and totes - Slater, Trajana |
|
|
2025-04-14 | vanderws |
LTAR April soil sampling, first sampling to include new R5 plots - Alyssa, Slater, Brian, Trajana |
|
|
2025-04-14 | dave |
GC run LTAR202503260403S2S3BGC had several vials mixed up in one series 3 tray received from the techs. All vials run in sequential order on the GC. Here is the order presented in the trays for series 3: …23, 24, 25, 46, 47, 48, 29, 42, 43, 44, 33, 38, 39, 40, 37, 34, 35, 36, 41, 30, 31, 32, 45, 26, 27, 28, 49, 50, 51, 52, etc…. |
|
|
2025-04-14 | vanderws |
Sieve LTAR April soil - Slater, Brian, Trajana, Andie Grind plants, pulverize BCSE deep core soil, weigh dry soil tins, dishes - Slater, Brian, Trajana, Andie |
|
|
2025-04-11 | Alyssa |
LTER Gas Series 3 - All + hydrosense (Alyssa, Andie) (Forest set DF2, CF2, SF3 split and sampled by two people due to issue with golf cart) Dishes - Brian |
|
|
2025-04-11 | kahmark |
Added CS650 sensors to T7r3,4,2,6 (did T7 r1,5 2 weeks ago). Added positions to Survey 123 and hard copy map. |
|
|
2025-04-11 | kahmark |
All chambers and bases are removed from BCSE G1 and 5. Compressor shut down in December for last measurements. Keeping both analyzers running to keep stable. Waiting for electric at LTAR R5 to move system. |
|
|
2025-04-10 | Alyssa |
Finish LTER Lysimeter filtering - Alyssa Prep LTER gas totes, vials - Brian BAF subsampling - Slater, Finish grinding GLBRC plants, mix air drying soil - Trajana |
|
|
2025-04-10 | Alyssa |
Acid washed dishes. |
|
|
2025-04-10 | Alyssa |
LTAR Gas Series 4 - Trajana, Slater, Brian + Hydrosense (Alyssa) Finish LTER gas frame prep - Alyssa |
|
|
2025-04-09 | Alyssa |
Recondition Cadmium Column. Lachat run GLBRC MLE MS soil (Lux Arbor) 20241106. |
|
|
2025-04-09 | Alyssa |
Collect LTER Lysimeters - Slater, Andie Prep LTAR, LTER gas frames - Brian, Trajana |
|
|
2025-04-09 | Alyssa |
Filter LTER soil extracts - Brian, Slater Measure and filter LTER lysimeter leachate - Andie, Trajana |
|
|
2025-04-08 | Alyssa |
Evacuate LTER Lysimeters - Brian, Trajana Finish sieving LTER soil - Slater |
|
|
2025-04-08 | Alyssa |
Prepared 1M KCL Prepared Color Reagent (2 L) 200 ml phosphoric acid 80 gm sulfanilamide, 2.0 gm N-1-naphthylethylenediamine dihydrochloride, Dilute to 2L with Nanopure H2O. Lachat run LTER soil 20241023. |
|
|
2025-04-08 | Alyssa |
Weigh LTER soil for extraction and moisture - Alyssa, Olivia, Slater LTAR vial, tote prep - Olivia. BAF subsampling - Slater |
|
|
2025-04-07 | Alyssa |
LTER Soil sampling - Alyssa, Brian, Slater, Trajana |
|
|
2025-04-04 | Alyssa |
Dishes, Grinding Plants - Slater, Olivia |
|
|
2025-04-04 | Alyssa |
Prepared Standards, Lachat run GLBRC MLE WC soil (Hancock) 20241017 |
|
|
2025-04-03 | vanderws |
LTAR Series 3 gas sampling - Slater, Andie, Alyssa (+Hydrosense), Olivia Collect LTAR leachate from 4/1 evacuation - Slater, Andie, Alyssa, Olivia |
|
|
2025-04-02 | vanderws |
Grind plants and finish SWF deep core archiving and subsampling - Slater, Andie LTAR gas vial and tote prep - Stacey |
|
|
2025-04-02 | vanderws |
Collection of LTAR leachate had to be delayed until 4/3 due to all day heavy rain and storms. |
|
|
2025-04-01 | vanderws |
Grind plants, pulverize BCSE deep core soil, SWF deep core archiving and subsampling, field lab clean-up - Olivia, Slater, Andie |
|
|
2025-04-01 | vanderws |
Evacuate LTAR lysimeters; LTAR gas chamber prep - Slater, Andie |
|
|
2025-03-31 | vanderws |
BCSE Series 2 gas sampling - Slater, Andie (Hydrosense too) |
|
|
2025-03-31 | vanderws |
SWF deep core archiving and subsampling - Slater, Andie |
|
|
2025-03-28 | vanderws |
Grind plants; pulverize BCSE DC soil; weigh, archive and subsample SWF DC soil - Slater, Trajana, Andie, Olivia Dishes, BCSE gas vial prep, weigh dry soil tins - Brian |
|
|
2025-03-28 | vanderws |
BCSE gas chamber prep - |
|
|
2025-03-27 | vanderws |
LTER 2 gas sampling (first full set for 2025), prairie strips had to be sampled in the afternoon - Slater, Brian, Trajana, Olivia LTER Hydrosense; Pull LTAR ASP1, ASP5, ASP6 frames for fertilizer and mowing - Alyssa |
|
|
2025-03-26 | vanderws |
LTAR 2 gas sampling - Slater, Brian, Trajana LTAR Hydrosense - Alyssa Sampled soil from new LTAR R5 plots, twelve 0-25cm cores per plot pooled, six from the north half and six from the south half, approx. evenly space across the plot EW; when a row crop was present alternated taking a core in the row and between rows - Stacey |
|
|
2025-03-26 | vanderws |
Filter LTER soil extracts, prep LTER gas vials/totes, dishes - Slater, Brian, Trajana Sieve LTAR R5 soil, remove subsample to send to A&L for S1 package, set the rest out to air dry for archive - Stacey |
|
|
2025-03-26 | Alyssa |
Lachat run LTER T4 Soil 10/22/2024. |
|
|
2025-03-25 | Alyssa |
Prepared 1M KCL, Reconditioned Cadmium Column. Lachat run LTER T3 soil 10/21/2024. |
|
|
2025-03-25 | vanderws |
Finish sieving LTER soil - Slater, Trajana Weigh LTER soil for extraction and moisture - Brian, Olivia Prep LTAR gas vials/totes, dishes - Brian, Olivia |
|
|
2025-03-25 | vanderws |
Prep LTAR and LTER gas chambers, install T7 and T7 microplot chambers - Slater, Trajana |
|
|
2025-03-24 | vanderws |
First 2025 LTER soil sampling, two 0-25cm cores NE of each station, did not sample T6 since flags had been pulled and switchgrass is still not harvested - Alyssa, Slater, Brian, Trajana, Andie |
|
|
2025-03-24 | vanderws |
Sieved LTER soil - Alyssa, Slater, Brian, Trajana, Andie |
|
|
2025-03-21 | vanderws |
Weigh and grind plants, pulverize BCSE deep core soil - Slater, Trajana, Brian, Olivia |
|
|
2025-03-21 | Alyssa |
Lachat run LTAR soil 9/30/2024. |
|
|
2025-03-21 | vanderws |
Replace T7 station flags, fix all other LTER, BCSE, LTAR station flags that were leaning or fallen - |
|
|
2025-03-20 | Alyssa |
Acid washed dishes. |
|
|
2025-03-20 | vanderws |
Finish filtering LTAR leachate, dishes - Brian Weigh and grind plants, archive air-dried soil, pulverize BCSE deep core soil - Slater, Trajana, Brian, Olivia |
|
|
2025-03-19 | Alyssa |
Lachat run GLBRC MLE WN soil (Rhinelander) 10/16/2024. |
|
|
2025-03-19 | vanderws |
Collect LTAR leachate - Brian, Trajana |
|
|
2025-03-19 | dave |
GC run BCSE20250307S1BGC had one series of vials submitted out of numerical order. All vials run on the GC in numerical order, but submitted series were …60, 62, 61, 63, 64, 65, etc… (so just 61 and 62 submitted out of order, but subsequently run in numerical order). |
|
|
2025-03-19 | vanderws |
Filter LTAR soil extracts - Brian, Trajana |
|
|
2025-03-18 | vanderws |
Weigh LTAR soil for moisture and N-extraction - Weigh and grind plants, pulverize BCSE deep core soil, subsample/archive SWF deep core soil - Slater, Trajana, Brian, Olivia |
|
|
2025-03-18 | Alyssa |
Prepared standards, prepared 1M KCL. Lachat run CLE inorganic N (Hammond) June 2024 soil. |
|
|
2025-03-18 | vanderws |
Evacuate LTAR lysimeters - |
|
|
2025-03-17 | dave |
GC run LTER20250306S1BGC: samples 241 and 242 were switched out of order in the trays submitted by the techs (likely just an oversight). Vials all run in numerical order on GC. |
|
|
2025-03-17 | vanderws |
First LTAR soil sampling for 2025, two 0-25cm cores per station (NE of station) - Alyssa, Slater, Trajana, Brian |
|
|
2025-03-17 | vanderws |
Weigh ASP6 biomass sampled on 3/12/2025 - Stacey Sieve LTAR soil - Alyssa, Slater, Trajana, Brian Weigh and grind plants, pulverize 2022 BCSE deep core soil - Slater, Trajana, Brian |
|
|
2025-03-14 | Alyssa |
Prepared Color Reagent (2 L) 200 ml phosphoric acid 80 gm sulfanilamide, 2.0 gm N-1-naphthylethylenediamine dihydrochloride, Dilute to 2L with Nanopure H2O. Prepared fresh Phosphate Buffer (1L) 28 gms Sodium Hydroxide pellets 50 gms sodium phosphate dibasic heptahydrate dilute to 1 L with nanopure. Prepared EDTA Reagent (1L) 66 gms ethylenediamine tetraacetic acid disodium salt dihydrate (EDTA) Approximately 7.0 gms sodium hydroxide pellets ph to 7.03 with NaOH pellets then dilute to volume with nanopure. Acid washed dishes. |
|
|
2025-03-14 | vanderws |
Weigh and grind plants, pulverize 2022 BCSE deep core soil (Alyssa trained), subsample and archive SWF deep cores soil - Slater, Brian, Andie, Trajana, Olivia |
|
|
2025-03-13 | vanderws |
LTAR Series 1 gas sampling - Slater, Brian, Olivia LTAR Hydrosense - Alyssa |
|
|
2025-03-13 | vanderws |
Weigh and grind plants - Brian, Olivia Subsample and archive SWF DC soil - Slater |
|
|
2025-03-13 | Alyssa |
Lachat run LTAR soil 8/28/2024. Reconditioned Cadmium Column. |
|
|
2025-03-12 | Alyssa |
Lachat run LTER Soil 9/17/2024. |
|
|
2025-03-12 | vanderws |
Finish filtering LTER leachate, prep LTAR gas vials and totes - Alyssa Weigh and grind plants - Andie, Brian Subsample and archive SWF DC soil - Trajana, Slater |
|
|
2025-03-12 | vanderws |
LTAR gas chamber prep, pull ASP4 microplot chambers and install in ASP3 microplots, sample ASP6 biomass to approximate what could be harvested… from each station, 1.5mN, 0mW to SE corner of 2 x 0.5m frame, plants cut at 6 inches above the ground with electric trimmers, bagged as UNSRT, if plants were lodged or lying down - they were not stood up for cutting. - Slater, Brian, Andie, Trajana |
|
|
2025-03-11 | vanderws |
Measure and filter LTER leachate - Brian, Trajana, Olivia Weigh SWF deep core moisture samples - Slater |
|
|
2025-03-11 | vanderws |
Collect LTER leachate - Slater, Brian Pull T7 flags and gas frames for burning - Olivia, Trajana Burn all T7 plots - Kevin, Sven, Dave, Stacey, Alyssa, Olivia, Trajana, Brian, Slater, plus several others (about 16 total) |
|
|
2025-03-10 | vanderws |
Evacuate LTER lysimeters (first for 2025) - Slater, Trajana, Brian, Andie |
|