Projectlog Entries List
Tags
LTER Series 15 gas sampling - Jon, Glori, Jordyn, Alyssa, Emily
LTER Hydrosense - Emily
Sample LTER forest soil - Alyssa
LTER gas chamber prep - Emily, Jon, Glori
Sample GLBRC Scale-up soil from L1, L3, M1, M2, M4 - Todd, Chris
Finish fertilizing N-deposition microplots (SF2, R3 all) - Glori, Emily
Pull BCSE gas frames, flags for harvest - Stacey, Emily
Prepare and begin fertilizing N-deposition microplots (R1 all, DF2, CF2) - Jon, Glori
LTER Series 14 gas sampling - Jon, Glori, Jordyn, Emily, Stacey
LTER Hydrosense - Emily
BCSE Series 18 gas sampling - Emily, Glori
BCSE Hydrosense - Alyssa
LTAR and LTER gas chamber prep - Jon, Olivia, Alyssa
GLBRC Scale-up plant species composition transects - Alyssa, Emily
LTER Series 12 gas sampling - Jon, Sam, Emily, Glori, Bella, Jordyn
LTER Hydrosense - Emily
Clip T7R2 ANPP - Alyssa, Glori, Bella, Jordyn
Finished BCSE G4,5,7,9,10 ANPP sampling - Alyssa, Jon, Emily, Glori, Jordyn, Sam, Bella
LTER gas chamber prep -
Start T7 ANPP sampling, clipped R1. 2mN, 4mE of each station flag to SW corner of 2 x 0.5m frame. Refrigerated and sorted later in the field lab - Alyssa, Jon, Emily, Glori, Sam, Bella
LTER 11 gas sampling - Sam, Olivia, Bella, Glori, Jon
LTER Hydrosense - Emily
Tried to sample LTER soil with bucket augers but conditions were very dry and difficult. Decided to postpone soil sampling.
Finished fertilizing N-deposition microplots in DF3 and CF3 - Sam, Emily
Sticky traps - Brian, Jon
Fertilize N-deposition microplots in all R1 and R2 plus SFR3 - Sam, Emily
Clip ANPP samples from T3, T4 prairie strips - Brian, Bella, Glori, Alyssa
LTER 10 gas sampling - Brian, Glori, JOn, Jordyn, Sam, Emily (Hydrosense too)
Finish ASP4, 5 flagging stations with REACH - Jon
LTAR 19 gas sampling - Jordyn, Jon, Sam, Olivia
LTAR Hydrosense - Emily
LTER gas chamber prep - Glori, Emily
Replace LTAR station flags (flagging tape in ASP4,5) with REACH - Sam, Jon