Projectlog Entries List

2026-08-06 vanderws

LTER 11 gas sampling - Sam, Olivia, Bella, Glori, Jon

LTER Hydrosense - Emily

mcse n-deposition
2026-08-04 vanderws

Tried to sample LTER soil with bucket augers but conditions were very dry and difficult. Decided to postpone soil sampling.

Finished fertilizing N-deposition microplots in DF3 and CF3 - Sam, Emily

Sticky traps - Brian, Jon

field mcse n-deposition
2026-08-03 vanderws

Fertilize N-deposition microplots in all R1 and R2 plus SFR3 - Sam, Emily

Clip ANPP samples from T3, T4 prairie strips - Brian, Bella, Glori, Alyssa

field mcse n-deposition
2026-07-24 vanderws

LTER 10 gas sampling - Brian, Glori, JOn, Jordyn, Sam, Emily (Hydrosense too)

Finish ASP4, 5 flagging stations with REACH - Jon

field ltar-plots mcse n-deposition
2026-07-23 vanderws

LTAR 19 gas sampling - Jordyn, Jon, Sam, Olivia

LTAR Hydrosense - Emily

LTER gas chamber prep - Glori, Emily

Replace LTAR station flags (flagging tape in ASP4,5) with REACH - Sam, Jon

ltar-plots mcse n-deposition