Projectlog Entries List

2026-08-28 Chris

Plant Sampling of Switchgrass P&K Study. Two samples per plot (1+N, 1 0N) Sample taken from pre-determined 1 sqft. area within each side of the plots. Switchgrass plants harvested at ground level, bagged. Samples taken to the Agronomy Farm to be dried and processed to be sent for analysis later.

Personnel: Chris Robbins, Todd Martin

field glbrc pk-study
2026-07-28 Chris

Plant Sampling of Switchgrass P&K Study. Two samples per plot (1+N, 1 0N) Sample taken from pre-determined 1 sqft. area within each side of the plots. Switchgrass plants harvested at ground level, bagged. Samples taken to the Agronomy Farm to be dried and processed to be sent for analysis later.

Personnel: Chris Robbins

field glbrc pk-study