Projectlog Entries List

2026-07-15 vanderws

Measure and filter LTAR leachate, filter LTER soil extracts, LTAR and BCSE gas vial prep - Jordyn, Glori, Emily, Brian

Sort ASP1 forage - Sam, Jon

glbrc lab ltar lter
2026-07-07 vanderws

Weigh T3, T4 soil for extraction, moisture and T21 whirlpaks (90-100g/whirlpak) - Olivia, Brian, Jordyn

BCSE gas tote prep, dishes - Jordyn, Brian

glbrc lab lter
2026-07-02 vanderws

Dishes - Jordyn

BCSE new vial prep - Glori

Field lab clean-up - Brian

glbrc lab
2026-07-01 vanderws

LTAR gas chamber prep - Brian, Jon, Sam

Sticky traps - Brian, Emily

Collect LTAR leachate - Sam, Jon

BCSE 11 gas sampling and Hydrosense - Emily, Glori

field glbrc ltar lter
2026-06-30 vanderws

BCSE gas chamber prep, then evacuate LTAR lysimeters - Emily, Brian

Sticky traps - Jon, Sam, Emily

Bury T21 soil bags. Bury whirl-paks in their corresponding plot. Measure or pace ~7m in a NE direction from the SW corner of each plot. At that point, place a meterstick perpendicular to the tape measure at the 50cm mark on the meterstick. Bury T21 A at one end and T21 B at the opposite end. In corn and poplar plots, the spacing should be adjusted to ensure both bags are buried within a row of wheat or poplars. Each bag gets buried over an orange garden marker at about a 45-degree angle with the top of the bag about 1” below the surface and the marker sticking out of the ground 1-2”. For removal in 21 days - someone can pull up on the orange marker to easily remove the bags. For burial, use a trowel or narrow shovel to lift the soil, place the marker and bag, and then remove the trowel and press down the soil to ensure contact with the buried bag. Try to disturb the plants as little as possible. A flag is placed at the 50cm point midway between the buried bags to help in locating them later. In T1-4 the flag should be in a corn row between the buried bags with all bags and flags within a row of corn. Wherever helpful, tie flagging tape on a plant above the flag, so it is easily located for collection.

  • Emily, Brian, Jon, Sam, Glori, Stacey
field glbrc ltar lter
2026-06-30 vanderws

Weigh LTER soil for extraction, moisture and T21 incubation - Glori, Jordyn, Brian around 11

BCSE and LTAR gas vial prep - Jordyn

glbrc lab ltar lter
2026-06-16 sven

raised the antenna on the Switchgrass tower at lux arbor to improve connectivity.

field fluxtowers glbrc
2026-06-08 sven

Air Temperature sensor at the Hancock Weather station failed. It's returning -100 C. and 112 logger is having trouble sending data.

I stopped the program to help with the download but it had no effect. I will restart the program.if I can't get it to download and check in a few days. The status table can be read but the status summary is empty.

glbrc met-station
2026-06-04 sven

power cycled cell modem at Lux Arbor to restore connection. Adjusted solar panels to the summer position.

glbrc marginal-land met-station
2026-06-01 sven

cleaned out raingauge on the BCSE

glbrc met-station
2026-05-05 sven

Noticed that the funnel was off on the rain gauge. It might have been blown off with the recent wind storms. I re-installed the funnel

glbrc met-station
2026-03-03 vanderws

BCSE Series 1 2026 gas sampling - Jon, Olivia

field glbrc
2025-12-02 sven

Adjusted REX and BCSE Solar panels to winter position.

glbrc rain-exclusion experiment
2025-08-18 dave

BCSE2025072507310814S15S16S17BGC GC sequence had vials submitted out of order. All vials run on GC in consecutive order. Vials that were out of order were as follows: S16 - ...16, 17, 19, 18, 20, 21... and vial #75 and vial #Dup3 were switched for each other; S17 vials in order except as noted here - ...60, 61, 78, 79, 80, 65, 74, 75, 76, 69, 70, 71, 72, 73, 66, 67, 68, 77, 62, 63, 64.

gc glbrc lab
2025-06-26 dave

BCSE20250530060506130619S7S8S9S10BGC sequence had one exception: Series 10 had a note that vials 8 and 5 were swapped in the field. Therefore, for series 10, they were run in that order on the GC, i.e. ...3, 4, 8, 6, 7, 5, 9, 10....

gc glbrc lab
2025-05-07 kahmark

Trenched in power for M2,3,4 and L1,2 today. At the M4 reference, was only able to trench maybe 6inches. KK/DW

fluxtowers glbrc
2024-11-20 dave

BCSE202410071104S16S17BGC run had some submitted samples out of order. All samples run on GC in numerical order. Series 16 samples out of order, submitted in following sequence: ...10, 11, 16, 13, 14, 15, 20, 17, 18, 19, 12, check, 21, 22....

gc glbrc lab
2024-11-20 kahmark

Lux marginal land site visited by Kevin/Stacey today. Found many corner posts and sockets pulled out and also north side of G10R3 found soil moisture probes dug up and chewed. Will not be able to repair. They are soil moisture profiler sensors for this plot..

glbrc marginal-land
2024-11-08 kahmark

KK/SV finished switchgrass gradient deep cores today, 6 plots (12 cores). Total of 64, two per plot. Core 1 was always in the south half of the plot and Core 2 in the north.

field glbrc
2024-11-06 kahmark

Completed all but 12 deep cores on the Switchgrass Gradient project. KK/DW Still need to collect inorganic N samples and another gas sample due soon.

field glbrc
2024-10-30 kahmark

Deep core of Switchgrass N Rate trial started today. KK/DW We cored the western 6 plots, 12 cores just after strip harvest.

glbrc
2024-10-30 kahmark

Removed all chambers from SWFG study for harvest.

glbrc
2024-10-25 kahmark

Adjusted all chamber heights in gashog to reflect reinstalled ht.

flux-trailer glbrc
2024-10-24 kahmark

Removed G5 autochambers for microplot harvest in the afternoon. Turned off chambers on gashog.

flux-trailer glbrc
2024-10-24 dave

GC Run SWFG series39 10/8/2024 2 vials out of order at sampling: 14 and 15 were switched at sampling, so will be run in the order ...12, 13, 15, 14, 16, 17.... GC Run SWFG series41 10/23/2024 2 vials out of order at sampling: 93 and 94 were switched at sampling, so will be run in the order ...92, 94, 93, 95, 96....

gc glbrc
2024-10-23 sven

Dave and Kevin replaced the chambers on G1 and restarted sampling. G1-3 overextending. Raised all tubing off the ground. Chambers removed 10/22 pm

flux-trailer glbrc
2024-09-24 dave

Checked all chambers in G1 and G5, except G5-5 (closed at the time). Trimmed corn leaves out of the path of the closures on G1 chambers. Most G5s were in good shape and required minimal trimming on this visit. All G5 lid connections appeared to be intact and working properly.

field flux-trailer glbrc
2024-08-16 dave

BCSE202407190731S12S13BGC: All vials run in consecutive order. Vials submitted by techs in this order for Series 12: 1, 18, 3, 4, 5, 14, 7, 8.... ....12, 13, 6, 15, 16, 17, 2, 19, 20, 21.... all other vials in order.

gc glbrc
2024-07-15 dave

G5-3 chamber lid fixed. May have been okay up to point of checking lids, but arm attachment popped off when checking. Fixed.

field flux-trailer glbrc
2024-07-03 sven

I removed the radio, datalogger, TDR100, relay, battery and antenna from the DF site.

glbrc
2024-06-25 dave

Running 3 series of GLBRC gas samples. Notes on Series 6 from Techs - Vials 1-40 swapped, i.e. vials 1-20 are actually vials 21-40 regarding site sampling. Series 7 no notes. Series 8 - a number of vials out of order. All samples run in numerical order. Series 8 vial order in trays: 1-40 ok, then 41, 42, 59, 60, 45, 46, 55, 56, 49, 50, 51, 52, 53, 54, 47, 48, 57, 58, 43, 44, 61, 62, 63,...

gc glbrc
2024-06-20 kahmark

Removing G1 lids for herbicide today. 4 Hr REI.

field flux-trailer glbrc
2024-06-17 dave

Approximately 4pm, trimmed switchgrass and any other plant material growing out of the G5 automated chambers. Also checked lids and trimmed any plants outside of chambers that were interfering with lid seals.

field flux-trailer glbrc
2024-06-05 dave

GLBRC Series 4 vials. Note from techs that vials 1 and 21 were swapped (i.e. 21, 2, 3, 4, 5...20, 1, 22, 23, etc.). Still run on GC in consecutive order (1, 2, 3, etc...)

gc glbrc
2024-05-30 kahmark

It appears the ICOS needs to have the mirrors cleaned. Likely some water entered the system over the weekend. Caliubration worked but sensitivity is down, and noise up.

flux-trailer glbrc
2024-05-29 kahmark

Trailer went down over the weekend. ICOS concentrations way off and flow blocked. Found issue with valves, then recalibrated ICOS with our reference gas. Added lids back on G1 last Friday. Currently not running trailer until morning.

flux-trailer glbrc
2024-05-21 kahmark

Removed chambers on the SWFG for fertilization. Will install tomorrow and clip in AM, then sample after lunch.

field glbrc
2024-05-20 dave

G5-3 updated chamber depths after moving: corner heights - 32.5cm, 32.2cm, 31.0cm, 30.0cm; center height - 29.5cm.

flux-trailer glbrc
2024-05-20 dave

Moved chamber 5-3 approximately 1 meter to the west to encompass some switchgrass plants, approximately 2pm. Trimmed all chambers in G5. Replaced clamp head on G1-5 (previous one had popped off a couple times).

flux-trailer glbrc
2024-05-20 kahmark

G1-6 showing negative CO2. Will check. Also removing chambers on SWFG for fertilization today.

field flux-trailer glbrc
2024-05-15 dave

BCSE automated chamber notes: G1-5: discovered a missing nut/bolt combo on lid that may leak air. Plugged temporarily with weatherstripping on both sides of hole. G5-1, 5-3, 5-4 chambers have very little to no switchgrass growth inside the chambers. May be time to move them to be more representative of the plot. G5-2: switchgrass growth to a few inches above top of chamber. This was trimmed back to being even/slightly below top of chamber.

flux-trailer glbrc
2024-05-13 dave

Re-installed G1 chambers after planting and liming management earlier in the day. Chambers all had to be shifted somewhat east to line up between newly planted rows. Four corner average heights recorded, along with one center measurement. (All numbers in centimeters.) G1-1: 30.7, 30.5, 29.7, 30.1cm, 30.5 center G1-3: 15.5, 15.6, 15.5, 15.6cm, 15.7cm center G1-2: 29.8, 30.1, 28.4, 28cm, 29cm center G1-6: 29.2, 28.9, 29.3, 29.5cm, 30cm center G1-5: 30, 29.8, 29.2, 28.9cm, 29.5cm center G1-4: 29.3, 29.5, 27.8, 28.2cm, 29.5cm center

flux-trailer glbrc
2024-05-13 dave

G1 chambers flagged and removed for planting and liming today. Chambers all removed by 9:30am. Will replace when farm management notifies us they have completed their work.

field flux-trailer glbrc
2024-02-05 dave

Checked automated chambers. No issues seen with 1-6, though reports of issues from remote data. 5-4 was missing a clamp head. Found it and replaced it. May need a new one as a long-term fix.

flux-trailer glbrc
2024-01-17 kahmark

Disconnected the incoming and outgoing sampling lines from the Licor and ICOS in the trailer until we can clear the chambers and get them operational.

flux-trailer glbrc
2024-01-11 kahmark

G5-6, G1-3, G1-5 all overextended. Turned down compressor outgoing pressure to just over 52psi. Will shut down system today prior to snowstorm and incoming polar vortex.

flux-trailer glbrc
2023-12-21 dave

Found chamber G5-6 (control) had a hyperextended lid on the east side. Put back in place. Going back out to see if I can adjust it with a screwdriver to prevent it from recurring.

flux-trailer glbrc
2023-10-29 vanderws

Process BCSE deep cores - Sidney, Alex

glbrc lab
2023-10-28 vanderws

Process BCSE deep cores - Sidney, Alex

glbrc lab
2023-10-07 vanderws

Process BCSE deep cores - Sidney

glbrc lab
2023-10-03 kahmark

Drone flight for albedo on BCSE and LTAR. Sunny, light breeze. White tarp measure after each. While flying the LTAR, flight lasted unusually long, when it was returning for next battery at 18%, The drone lost complete power about one foot above the home position. Hit the ground and disturbed the mount for the front camera and the ribbon cord that runs from gimbel to the drone system. Repaired.

glbrc
2023-10-03 vanderws

G6 ANPP sampling and species composition transects. Three NS transects per plot, main only. Each transect ~2m east of the station flags and numbered 1-3 based on the station number. Stop about every 1m to identify and measure first intercepted plant. ANPP: Station 1 only: 3mS, 0.5mW to NE corner of 1.52x0.66m frame to avoid microplot. All other stations: 3mS, 1.5mW to NE corner of 1.52x0.66m frame. MISGI bagged separately, weeds (if any) sorted to species. - Alyssa, Gloria, Helen, Emily

field glbrc
2023-10-01 vanderws

Process BCSE deep cores - Sidney

glbrc lab
2023-09-30 vanderws

Process BCSE deep cores - Sidney

glbrc lab
2023-09-24 vanderws

Process BCSE deep cores - Sidney

glbrc lab
2023-09-23 vanderws

Process BCSE deep cores - Sidney

glbrc lab
2023-09-18 kahmark

Removed flags and chambers from Martha's study on the north baitcrop area BCSE.

Additionally, removed all shelters on the Lux Arbor marginal land site. Three reps show high stress. Also, deer pellets in three of the four sheltered areas. ALOT! Only deployed one set of RH/T sensors in rep four this year.

field glbrc marginal-land
2023-09-17 vanderws

Process BCSE deep cores - Sidney

glbrc lab
2023-09-16 vanderws

Start processing BCSE 2022 deep soil cores - Sidney

glbrc lab
2023-09-15 kahmark

Lake City Bulk Density cores at all plots 0-4" and 5-9" depths. Shelters moved into winter positions and screws deployed. Checked all loggers G5r2 121 SN 43047, G5r1 127 SN43040, weather SN37075, G5r3 125 SN43043. Checked rain gauge. Some labels were missing, written on core or cap. Possibly sampled a few on an earlier trip with Ashim. Removed RH/T sensors around noon.

glbrc marginal-land
2023-09-14 kahmark

Sampled bulk density at all Escanaba plots 0-4" and 5-9" depths, 2" wide slide hammer sampler AMS, Inc. Checked all loggers G5r1 116 SN42921, G10r3 119 SN43039, G5r2 120 SN43044, 38603 weather station. Removed all shelters by noon. Removed RH/T sensors. Checked rain gage

glbrc marginal-land
2023-09-13 kahmark

Sampled Rhinelander all plots for Bulk Density. 0-4" and 5-9" depth cores (2" wide). Also sampled bulk soil at 22 plots, both depths. Soil was rocky so we used a drain spade shove for this portion. Filled in all holes. Checked data loggers and recorded SNs. SN 38838 weather station, G5r1 126 SN43048, G5r3 124 SN43041, G5r2 118 SN43042. Checked rain gage. Filled in all holes.

glbrc marginal-land
2023-09-12 kahmark

Sampled all plots for bulk density. 0-4" and 5-9". One inch spacing is due to the non-sampled portion of first core. That one inch is discarded. Checked all loggers and recorded SNs. G5r4 128 SN43046, G5r3 129 SN43045, G5r2 122 SN43049, SN 38839 weather station.

glbrc marginal-land
2023-09-05 vanderws

Started BCSE G4,5,7,9,10 ANPP clipping (finished through G4R2). Station 1: 4mS, 1mW to NE corner of 2 x 0.5m frame, to avoid subplot. Station 2,3: 4mS, 2mW to NE corner of 2 x 0.5m frame. Wasn't sorted, bagged as UNSRT. -

field glbrc
2023-08-30 dave

Set fallen HOBO sensor on t-post at Lux Arbor MLE switchgrass site (block 3?). Sensor remained about 1m off ground while collecting previous data (unsure when sensor fell over sideways). Now is upright, approximately 20-30 cm above switchgrass. Inside shelter sensor remains solid.

field glbrc marginal-land
2023-08-08 kahmark

Reestablished 8 plots in Martha/Ilyas study with excess N. Kevin hoed and raked each plot to loosen soil. Added Urea 46% after Martha weighed out. Control (0N) and three very high rates of N (400,800,1200gN/m2) in an attempt to reach the threshold of n2O emissions..

Included an image of the addition prior to raking in.

On 8/2 Martha weighed out 184,365, and 552g of urea. I checked her calculation on 8/3 and found she did not add the proper amount to the plots. She will adjust today. ADD: 8/7 kept new additions as is. Started sampling 8/8.

field glbrc
IMG_20230802_144240333(1).jpg
2023-08-01 vanderws

2023 BCSE G8 ANPP/LFLIT 0.5 x .95m wooden frame North trap… 0mS, 3mE of station 3 to NW corner of frame oriented with short ends on the north/south South trap… 2mS, 2mE of station 1 to NW corner of frame oriented with short ends on the east/west Collect newly fallen poplar leaves as LFLIT (if any).
Clip all biomass rooted inside frame and bag labeled UNSRT. Leave the frame in place and clip screen in place to collect leaf litter as it falls from the poplar trees.

2023 BCSE G8 species composition transects Three NS transects per plot, main only. Each transect ~2m east of the station flags and numbered 1-3 based on the station number. Shift slightly to go down center of two tree rows. Record which tree rows you are between (row 1 is on the west side of the plot). Stop about every 1m to identify and measure first intercepted plant in the understory, not poplar trees.

  • Alyssa, Evan, Helen, Rick, Lauren
field glbrc
2023-07-26 kahmark

7/26 there was a problem with G5-2 lid solenoid on the trailer system. Found the signal wire to the switch was not connected, but also no lids were firing in close mode. Found a ground wire off as well. Reconnected the G5-2 lid wire and should all be working properly. DW checked the compressor as well.

flux-trailer glbrc
2023-07-20 kahmark
  • 7/17 - Lake City with Dave and Ashim to collect bulk soil samples at 0-10 and 10-25cm using a 2" sampler and slide hammer (at all sites). Bulk density will be collected in early fall.
  • 7/18 - Escanaba and
  • 7/19 Rhinelander and Hancock. Rhinelander soil very rocky and dry, will need to finish R3 and 4 Bulk soil and bulk density.

Changed battery at weather station Rhinelander. Changed PAR and Solar Radiation sensor at Lake City and Escanaba. Dave installed RH/T and two shelters each at Lake City and Escanaba., Calibration images saved here.

field glbrc marginal-land
IMG_20230720_145437041.jpg
2023-07-19 kahmark

Rhinelander and Hancock bulk soil sampling KK, DW, AD. Three 0-4" and 4-10" cores per plot. All holes filled. All plots sampled.

glbrc marginal-land
2023-07-19 kahmark

Sampled all plots for bulk soil at Rhinelander and Hancock MLEs. Three cores each of 0-10cm then 10-25cm below. Each core was taken in a one meter square area, one step north of the plot centerline. No more than two meters in the plot (from side) Cores were collected about .5-1 m apart. Holes filled with soil just outside or at the edge of the plot. Took approximately five hours. KK, DW, AD. 2" core samplers. No bulk density. G5 cores taken 7 steps just outside the reserve area. All collected in +N. New battery at the weather station in Rhinelander. We broke two samplers at Rhinelander and stopped bulk soil just prior to finishing R2. All poplars sampled. Used a drain spade to sample at R3 and 4 in Hancock. Created an approximately 4" diameter circle, then inserted spade 10cm and popped up soil. cleared hole, repeated in the 10-25cm depth. Worked very well and was quite fast. Filled in holes when completed.

glbrc marginal-land
2023-07-18 kahmark

Escanaba bulk soil sampling KK, DW, AD. Three 0-4" and 4-10" cores per plot. All holes filled. All plots sampled.

glbrc marginal-land
2023-07-18 kahmark

Sampled all plots for bulk soil at Escanaba MLE. Three cores each of 0-10cm then 10-25cm below. Each core was taken in a one meter square area, one step north of the plot centerline. No more than two meters in the plot (from side) Cores were collected about .5-1 m apart. Holes filled with soil just outside or at the edge of the plot. Took approximately five hours. KK, DW, AD. 2" core samplers. No bulk density. G5 cores taken 7 steps just outside the reserve area. All collected in +N. Also added two sets of RH/T sensors (one under shelter and one in ambient 0N on a post). Swapped PAR and solar radiation sensors for recalibration.

glbrc marginal-land
2023-07-17 kahmark

Sampled all plots for bulk soil at Lake City MLE. Three cores each of 0-10cm then 10-25cm below. Each core was taken in a one meter square area, one step east of the plot centerline. No more than two meters in the plot (from side) Cores were collected about .5-1 m apart. Holes filled with soil just outside or at the edge of the plot. Took approximately five hours. KK, DW, AD. 2" core samplers. No bulk density. G5 cores taken 7 steps just outside the reserve area. All collected in +N. Also added two sets of RH/T sensors (one under shelter and one in ambient 0N on a post). Swapped PAR and solar radiation sensors for recalibration.

glbrc marginal-land
2023-07-17 kahmark

Lake City bulk soil sampling for C and N. Ashim has SURF. Three cores 0-4" and 4-10", collected 3 per plot of each depth. Bagged and labeled. KK, DW, AD. Very dry conditions.

glbrc marginal-land
2023-07-10 kahmark

Flew BCSE for albedo from 11:30-12:15ish. Fairly windy and difficult to keep the drone steady over the white reference sheet. Sunny

field glbrc
2023-07-05 dave

Trimmed switchgrass emerging above G5 automated chambers. Found G1-2 lids up, but north clamp down. May have blocked closure of lids over the extended weekend. Fixed north clamp.

KK- solenoid for this chamber not currently connected due to issue is either solenoid or clamps. Will address soon.

field flux-trailer glbrc
2023-06-27 dave

BCSE G1 automated flux chambers removed for fertilization approximately 10am. Returned to service by approximately 12:30pm.

field flux-trailer glbrc
2023-06-27 dave

BCSE G5, chamber 4 - west lid connector had become unattached. Removed old, rusty connector and replaced with new. (Approximately 2pm.)

field flux-trailer glbrc
2023-06-27 dave

BCSE G5 automated flux chambers - trimmed all switchgrass in chambers to at/below chamber ceiling. Work done approximately 12:30pm.

field flux-trailer glbrc
2023-06-22 kahmark

Flew BCSE and LTAR ACSE from 11:00 to 1:00PM. Full sun on the BCSE with reference trp at the end of the flight. At the LTAR site, flew the first set of plots in full sun and the last ten in cloud cover. Then flew the reference tarp in cloud cover. We should use the BCSE full sun reference for the first portion of the LTAR as well.

field glbrc
2023-06-01 kahmark

Ilya project fertilizer applied today. Control plus three rates of Urea (N), ~8g, ~32g, and ~76g applied over 1m2. Raked in, very dry soil right now (by Martha and Ilya). Plots designed, laid out, and rototilled by Kevin in October 2022 and April 2023 (KK and DW).

glbrc
2023-05-25 dave

Moved each G1 automated chamber ~8-12 inches east of previous location to place between corn rows. Planting offset from last year, requiring chamber movement to keep them between rows. All boxes moved between 10am and 11am.

field flux-trailer glbrc
2023-05-19 dave

3 G1 automated chambers that were moved eastward on 5/12 to accommodate the new sprayer were moved back to previous location (new sprayer didn't work out, so old sprayer used). Chambers moved approximately 11am.

field flux-trailer glbrc
2023-05-05 kahmark

Kevin and Dave retilled Ilya's 2x2m plots in the baitcrop area today.

field glbrc
2023-04-14 kahmark

Flew Matrice 100 drone for albedo on BCSE around 11AM, took images of T7s for Nameer, all reps. Plan to fly ACSE this afternoon.

field glbrc
2023-03-20 vanderws

BCSE gas chamber prep - Helen, Emily

field glbrc
2023-02-01 dave

Shut down compressor in trailer (per Kevin). Changed shut-off valves on manifolds to Swagelok. Checked chambers - all lids in order, all holding pressure except chamber 1-2.

field glbrc flux-trailer
2023-01-12 dave

eastern lid on chamber 5-5 was found closed on inspection at 8am. Arm attachment had come apart in the usual place. Reattached and arm/lid appear to be working correctly.

field flux-trailer glbrc
2023-01-11 dave

Chamber lids hyperextending on 1-3,1-5, 5-3, and 5-6. Fixed 1-3, 5-3, and 5-6 - was able to reset and adjust arm/lid attachment to help minimize this in the future. 1-5 reset, but locking nuts could not be loosened to adjust arm. Kevin later adjusted the compressor pressure down to help prevent this from happening going forward.

field flux-trailer glbrc
2022-11-21 kahmark

Cleared snow from all chambers. removing snow to internal height, clearing area around sampling port, clearing around actuators so they close easily.

glbrc flux-trailer
2022-11-10 kahmark

Set up Gelfand carbon vs N2O flux project today. Incorporated 100 lbs of wet weight sorghum into four randomized plots 2m x 2m using a rototiller. Also rototilled the four control plots. Sorghum amended plots have red flag. Four brown paper bags were collected and weighed by Stacey.

glbrc field
2022-11-07 kahmark

Today, laid out Ilya's 2023 project in the north end bait crop to the east of the two track leading to the ball field. (measurements to come). Eight 2m x 2m plots, 2m apart in an area tilled and finished by Joe. The project is 16 m wide east to west, 6m wide north to south and four feet north of the grass alleyway. Previous crop was soybean. Four plots will be rototilled with sorghum at least six inches vertically. Four control plots also rototilled but not amended with carbon.

glbrc
PDF
Loading...
2022-09-29 dave

Check on chambers: G1 - 2,3,4,5,6 all had suspected leaf interference. Leaves removed from chamber opening area. G5 - 1,6 had slight leaf/plant interference - cleaned up/removed. Chamber 5 had west arm come loose, so lid half was closed on inspection. Fixed.

glbrc flux-trailer field
2022-09-21 dave

Flux chamber check: G1 had possible interference from senescing corn leaves on chambers 1, 2, and 6. Leaves cleared to prevent further interference.

field glbrc flux-trailer
2022-09-20 kahmark

Flew albedo over BCSE at aprox. 1100AM. Hazy sky and no wind. Ht = 25' above ground near miscanthus on R2 (highest point in field). Checked trailer instruments and new air conditioning. Running well. Dave checking lids regularly.

flux-trailer glbrc
2022-09-13 dave

Checked G1/G5 chambers at BCSE. Removed 3-4 SG plants laying across the face of chamber G5-1. All other chambers okay.

flux-trailer glbrc field
2022-09-09 dave

Gopher trapped in chamber G5-4. Assisted on rescue/escape.

field flux-trailer glbrc
2022-09-07 kahmark

Took light saturation curve on switchgrass G5R1 with Mauri. Use for shelter comparison.

glbrc
2022-08-31 dave

Flux chamber inspection: G1 - chamber 6 and 3 had 1-2 plants fallen across width of chamber. G5 - chamber 3 had 1-2 plants across width of chamber. Chamber 4 had a whole swath of plants across the chamber - dozens at least. May have been triggered by deer traveling through plot, near chamber.

flux-trailer glbrc