Projectlog Entries List
Tags
LTAR Series 23 gas sampling - Stacey, Emily, Olivia, Jon
BCSE Series 17 gas sampling - Glori, Jordyn
LTAR and BCSE Hydrosense - Emily
Collect leaf litter (T5, CF, DF, SF) - Olivia, Jordyn, Jon, Glori
MLE Lake City plant species composition transects - Alyssa, Jon, Emily, Glori
Sample additional SWF soil for Darcy McRose. Sampled ten cores per treatment (SWF1 and SWF8) spread across all replicates to 4-inch depth with 0.75" push corer. The soil were kept unsieved, in plastic bags and shipped via UPS overnight on ice. - Olivia, Jordyn
LTER forest and T8 soil sampling - Olivia, Jordyn
LTAR and BCSE gas chamber prep - Olivia, Jordyn
Finish MLE Lux Arbor plant species composition transects - Jon, Emily
G3 soybean ANPP sampling, used 1.52 m x 0.66 m frame, all stations: 1.52mS, 0.66mE to NW corner of 1.52x0.66m frame. Counted soybean stems per row. Sorted weeds in the field. - Glori, Olivia, Alyssa, Emily, Jon
BCSE Series 16 gas sampling - Glori, Jordyn
BCSE Hydrosense - Olivia
Set forest leaf litter traps - Emily, Jon,
Collect T5 LFLIT, trim under and around traps -
BCSE gas chamber prep -
BCSE S13 S14 S15 GC run had some samples submitted out of order.
S14 had vials 19 and 20 switched in the field racks.
S15 had four out of order submitted as follows: vial 52, 50, 51, 49
All samples run sequentially on DawnGC
Finished BCSE G4,5,7,9,10 ANPP sampling - Alyssa, Jon, Emily, Glori, Jordyn, Sam, Bella
LTER gas chamber prep -
Start T7 ANPP sampling, clipped R1. 2mN, 4mE of each station flag to SW corner of 2 x 0.5m frame. Refrigerated and sorted later in the field lab - Alyssa, Jon, Emily, Glori, Sam, Bella
Finish BCSE G4,5,7,9,10 species composition transects and continue ANPP sampling - Alyssa, Jon, Emily, Glori, Jordyn, Sam
BCSE G4,5,7,9,10 species composition transects and ANPP sampling - Alyssa, Jon, Emily, Glori, Jordyn
BCSE gas Series 15 - Jordyn, Emily am, Hydrosense- Emily
BCSE transects - Alyssa, Jon am
BCSE ANPP - Sam, Bella am
BCSE gas, vial prep - Olivia, Jordyn AM
BCSE transects - Alyssa, Olivia pm
Move LTER T7 shelters with Nameer/Mark, BCSE ANPP- Jon, Sam, Emily, Glori, Jordyn pm
Continue BCSE G4,5,7,9,10 species composition transects - Alyssa, Bella AM/PM
Start BCSE G4,5,7,9,10 ANPP clipping. All stations: 2mS, 1mE to NW corner of 2 x 0.5m frame. Clip with electric trimmers at ground level, bag as UNSRT. Collect SURFL. - Glori, Jordyn PM
Start BCSE G4,5,7,9,10 species composition transects. Three NS transects per plot, main only. Each transect ~2m west of the station flags and numbered 1-3 based on the station number. Stop about every 1m to identify and measure first intercepted plant. - Alyssa, Glori, Jordyn PM
BCSE 14 gas sampling - Brian, Alyssa
BCSE Hydrosense - Alyssa
Collect LFLIT from T5 traps, trim under traps - Emily, Glori
Continue clipping T3, T4 R1 prairie strip ANPP - Sam, Jon
LTAR 20 gas sampling - Alyssa, Glori, Sam, Olivia
LTAR Hydrosense - Emily
BCSE gas chamber prep - Jon
Start cutting T3R1 prairie strip ANPP: Along each EW transect (South, Center, North): 2 x 0.5m frame, 5m south of strip center to center of 2m frame side (north side). Cut T4 corn paths to station flags - Jon, Emily
Collect T21 bags from T3, T4 stations and prairie strips -
LTAR 18 gas sampling - Glori, Brian, Jordyn, Bella
BCSE 13 gas sampling - Jon, Sam
LTAR, BCSE Hydrosense sampling - Emily
T5 understory ANPP sampling, set LFLIT traps. NS trap… 2.4mN, 1.2mW of station 5 to SE corner of trap, frame oriented with short ends on the north/south; label ex. T5R1 NS EW trap… 2.4mS, 1.2mW of station 3 to NE corner of trap, frame oriented with short ends on the east/west; label ex. T5R1 EW. Collect newly fallen poplar leaves within frame as LFLIT (if any). Clip all biomass rooted inside frame with scissors – as close to the ground as possible. Bag as LIVE to sort in the field lab later (store in black bags in fridge). Use electric trimmers to trim back plants outside the frame to keep them from falling over the frame. Leave the frame in place and lay a screen inside it. Push the screen down inside the frame so it rests on the ground. Use clips (at least 6/trap) to attach the screen to the wooden frame on all sides. - Alyssa, Jon, Emily, Sam, Bella, Glori, Jordyn, Brian
Postponed field work, including LTAR 18 and BCSE 13 gas sampling, due to hazardous air quality outdoors from Canadian wildfire smoke.
Reinstalled ASP1 gas chambers after forage baling - Sam
Postponed LTAR 18 and BCSE 13 gas sampling due to hazardous air quality outdoors from Canadian wildfire smoke. No field work today.
The usb to serial pigtail between the rpi and the RF407 radio in the BCSE gas trailer appears to have failed. I replaced it with one from the ICOS system.
Rebury some T3, T4 T21 bags for station 5 as they were buried on the foot path in error, so moved further west between foot path and prairie strip.
Collect LTAR leachate - Emily, Brian
LTAR, BCSE gas chamber prep - Jordyn, Glori
Sticky traps - Jon, Sam
LTAR gas chamber prep - Jon, Brian, Emily, Glori, Sam, Jordyn
Sticky traps - Jon, Brian, Sam
BCSE 12 gas sampling, Hydrosense - Emily, Glori
Collect LTER leachate - Sam, Jordyn
Sticky traps - Sam, Emily
Prep BCSE gas chambers, evacuate LTER lysimeters - Jon, Glori
Nitrogen Application Study gas and Hydrosense sampling - Olivia
Cut MCSE corn paths - Olivia, Sam, Emily
Help Nameer and others raise the height of LTER Resource Gradient rainout shelters - Jon, Glori